Corporate Information
Axianergy (M) Sdn. Bhd.
Company Name | : | AXIANERGY (M) SDN. BHD. |
Date of Incorporation | : | 17 November 2014 |
Registration Number | : | 201401041986 (1118150-U) |
Authorized Capital | : | RM 400,000 shares @ RM1.00 share |
Paid up Capital | : | RM 1,500,000 |
Banker | : | CIMB BANK BERHAD, MAYBANK BERHAD & AFFIN BANK BERHAD |
Business Address | : | AXIANERGY (M) SDN. BHD. No. 18 & 18-1, Persiaran Metro Sendayan 1, Sendayan Metropark, 71950 Bandar Sri Sendayan, Seremban, Negeri Sembilan |
Telephone | : | 06 – 792 2154 |
Fax | : | 06 - 792 2451 |
: | This email address is being protected from spambots. You need JavaScript enabled to view it. | |
Contact Person | : |
M Shafidz Yasin Mohd Asri Awang |
Project Highlights
EPCC OF NPS 36 PULAU INDAH LATERAL PIPELINE (TULIP)
- Year: 2021
- Owner: Petronas Gas Bhd
- Scope: Install NPS 36 gas pipeline, SL, SR, BV, TOV and metering station
REPAIR AND REHABILITATION OF PIPELINE FACILITIES OPERATED BY PETRONAS GAS BERHAD – GAS TRANSMISSION & REGASIFICATION (PGB-GTR) (REHAB)
- Year: 2021
- Owner: Petronas Gas Bhd
- Scope: Dig-up and verification UG pipe for southern region
EPCC OF NEW PRESSURE CONTROL VALVE (PCV) INSTALLATION AT ML 504 STATION (PMIX)
- Year: 2020
- Owner: Petronas Gas Bhd
- Scope: Install pressure control valve (PCV) in block valve station ML 504
EPCC OF PROJECT MANGOSTEEN - BIOMASS CONVERSION TO BIO-MONOETHYLENE GLYCOL (BIO-MEG)
- Year: 2020
- Owner: Petronas Research Sdn Bhd
- Scope: Process Plant
EPCC OF KLIA PIPELINE PROJECT (KLIPP)
- Year: 2020
- Owner: Petronas Gas Berhad
- Scope: Pipeline & Launcher Station.
EPCC OF HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC)
- Year: 2019
- Owner: Petronas Gas Berhad
- Scope: Mechanical, Piping, Civil E&I & Structure.
EPCC OF TELOK GONG LOOP PIPELINE, MELAKA (TUAH)
- Year: 2018
- Owner: Petronas Gas Berhad
- Scope: Hot Tap Station, Scarapper Launcher Station, Install a new NPS 28 Gas Pipeline (Telok Gong Loop Pipeline) approx. 22km from Taboh Naning to Kuala Sungai Baru Melaka, Block Valve Station, Take Off Station and Scarapper Receiver/Metering Station.
REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) - PACKAGE A
- Year: 2018
- Owner: Petronas Gas Berhad
- Scope: Fabrication, Supply and Installation of Aerial Marker & ROW Warning Signages, Supply and Install Drop Gate
UTILITIES INSTALLATION RFPC
- Year: 2018
- Owner: SAFRAN MESSIER BUGATTI DOWTY
- Scope: Installation of paint booth and Supply Electrical Material
EPCC OF TEBONG CITY GATE STATION UPGRADING PROJECT, MELAKA (TURBO)
- Year: 2018
- Owner: Petronas Gas Berhad
- Scope: Underground Utilities Detection, Line Tracing, Trial holes for existing utilities/pipeline and Dismantling, Packaging, Transportating & Relocating of existing facilities.
PIPE SLEEPER AND UNDERGROUND SERVICES PACKAGE-22 AT RAPID PROJECT
- Year: Feb 2017
- Owner: BINA PURI Sdn Bhd
- Scope: Pipe Sleeper And Underground Services Package 22 At Rapid Project (Civil And Pipeline)
PENGERANG PIPELINE REGASTIFICATION, PCC RGT2
- Year: January 2016
- Owner: PBJV Group
- Scope: Provision of Construction of 2 Nos Hardstand, Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam For Pengerang Gas Pipeline.
HA-MBD PROJECT PHASE (II)
- Year: January 2016
- Owner: Technip Geoproduction (M) Sdn. Bhd.
- Scope: Civil Detail Engineering Services For New Transformer and Switchgear Building.
HA-MBD PROJECTS (PHASE II)
- Year: November 2015
- Owner: Technip Geoproduction Sdn. Bhd.
- Scope: CNC: Final Machining #2 sell Installation Works
PENGERANG PIPELINE REGASTIFICATION, PCC RGT2
- Year: September 2015
- Owner: PBJV GROUP
- Scope: RGT2- Pengerang Pipeline-Station Civil Work (SR500,SR501, ML502, ML504, ML505, OV511A, TOV511B, and TOV512)
C&S WORKS – MAINLINE VALVE STATION AT PENGERANG, JOHOR
- Year: September 2015
- Owner: Petronas Gas Berhad
- Scope: C&S Works at Mainline Valve Station For Procurement Construction And Commissioning (PCC) of Pengerang Gas Pipeline (PGP) Project
INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2, N.S.
- Year: August 2015
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
- Scope: Installation Of Mechanical Equipment With Certified ISO 9001:2008
- Single Lifting Of Furnace : 25 Tonnes
PROCUREMENT, FABRICATION, INSTALLATION AND COMMISSIONING OF PIPELINE AND PROCESS PIPING – HA MBD PHASE 2, N.S.
- Year: August 2015
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
- Scope: Procurement, Fabrication, Installation And Commissioning Of Pipeline And Process Piping With Certified ISO 9001:2008
- Total Dia-Inch: 38,000 Dia-Inch Piping
HA-MBD PROJECTS PHASE (II)
- Year: MAY 2015
- Owner: Technip Geoproduction (M) Sdn. Bhd.
- Scope: HA-MBD PHASE II (Mechanical Piping, Painting & Insulation Package)
PENGEREANG PIPELINE REGASTIFICATION PCC RGT2
- Year: March 2015
- Owner: PBJV Group
- Scope: Cutting Soil, excavate for earth including hard materials and fill to designated proposed
RFPC, HA MBD PROJECT, N.S.
- Year: February 2015
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
- Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
- Total Dia-Inch: 630 Dia-In In Piping, 10 And 20 Metric Ton Structure
TOX-2 (FLARE) PIPING MODIFICATION
- Year: February 2015
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
- Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
NEW IA LINE PANEL TO ANDRITZ, HA- MBD PROJECT N.S
- Year: January 2015
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
- Scope: Installation Of IA Tubing & Equipment To Andritz at Preform Area
PCC (RGT 2) PENGERANG PIPELINE, JOHOR BAHRU
- Year: November 2014
- Owner: Petronas Gas Berhad
- Scope: Services Support To Cpm Construction Sdn Bhd
o Nde
o Heavy Machinery
o Third Party Inspector
o Diesel Supply
o Perform Wqt
o Inspection Site Boom
o Site Clearing 32 Km
ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA – MBD PROJECT N.S
- Year: November 2014
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
- Scope: Installation Of Steel Structures At V1 Area & Utility Area
MODIFICATION WORKS TO ROOF REPAIR, HA – MBD PROJECT N.S
- Year: November 2014
- Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
- Scope: Piping Installation & Modification Works To Roof Repair
PENGERANG PIPELINE REGASTIFICATION, PCC RGT2
- Year: October 2014
- Owner: CPM Construction Sdn. Bhd.
- Scope: Cutting/Chipping Trees Along ROW.
PENGERANG PIPELINE REGASTIFICATION, PCC RGT2
- Year: October 2014
- Owner: CPM Construction Sdn. Bhd.
- Scope: Disposal Trees to Dumping Area