HomeWhy UsCommitment to Health, Safety & Environment

Commitment to Health, Safety & Environment

Safety Policy

safety

HEALTH, SAFETY, AND ENVIRONMENTAL POLICY (H.S.E)

 

AXIANERGY (M) SDN. BHD, consider effective Occupational Safety and Health management to be of prime importance to its business and is committed to continuous in improvement in performance in all these areas.

AXIANERGY (M) SDN. BHD will:-

  • Prevent injury and ill health to workers with the provision of safe and healthy working conditions and in-line with the identified risks and opportunities.

Comply with all legislative and client requirements pertaining to OccupationalSafety & Health as its minimum standard .

Pursue high standards of OccupationaI Safety & Health management as an integral part of efficient management of the business ensuring that all business decision takes proper account of Occupatonal Safety & Health implications.

  • Develop, implement and maintain 0ccupationaI Safety & Health management system consistent with AXIANERGY (M) SDN. BHD. business intentions.

Identify and assesses the Occupational Safety & Health risk associated with our activities and provide control measure that mitigate, eliminate or reduce the risks to a level as low as reasonable practicable .

Ensure that contractors’ Occupational Safety & Health performance meets AXIANE RGY (M) SDN. BHD standards.

Monitor our Occupational Safety & Health performance and implementation of available programme to achieve improvement on a continual basis.

Committed to involve consultation and participation of workers in managing and improving

Occupational Safety & Health management system.

 

4      Publicize and communicate this policy to all persons who work for or on behalf and make it readily available to the public upon request.Directors of AXIANERGY (M) SDN. BHD. will lead responsibility for Occupational Safety & Health. It is responsibility of all employees to implement this policy together collectively and individually.

ENVIROMENTAL POLICY

AXIANERGY (M) SDN. BHD, consider effective Environmental management to be of prime importance to its business and is committed to continuous in improvement in performance in all these areas.

AXIANERGY (M) SDN. BHD will:-

•    Prevent pollution and protect the environment which are under our control and influence, with life cycle sustainability consideration in engineering and construction.

•    Comply with all legislative and client requirements pertaining to Environment as its minimum

standard .

Pursue high standards of Environmental management as an integral part of efficient management of the business ensuring that all business decision takes proper account of Environmental implications,

Develop, implement a n d maintain a Environmental management system consistent with AXIANERGY (M) SDN. BHD business intentions.

Identify and assesses the Environmental risk associated with our activities and provide control measure that mitigate, eliminate or reduce the  risks  to  a  level  as  low  as  reasonable practicable .

Ensure that contractor s’ Environmental performance meets AXIANERGY (M) SDN. BHD. standards.

Monitor our Environmental performance and implementation of av ailable programme to achieve improvement on a continual basis.

•    Publicize and communicate this policy to all persons who work for or on behalf and make it readily available to the public upon request.

Directors of AXIANERGY (M) SDN. BHD. will lead responsibility for Environment. It is responsibility of all employees to implement this policy together collectively and individually.


 

 

 Diversified Services, Unvarying Quality

 

 

 

 pic1

Project Highlights

EPCC OF NPS 36 PULAU INDAH LATERAL PIPELINE (TULIP)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Install NPS 36 gas pipeline, SL, SR, BV, TOV and metering station

REPAIR AND REHABILITATION OF PIPELINE FACILITIES OPERATED BY PETRONAS GAS BERHAD – GAS TRANSMISSION & REGASIFICATION (PGB-GTR) (REHAB)

  • Year: 2021
  • Owner: Petronas Gas Bhd
  • Scope: Dig-up and verification UG pipe for southern region

EPCC OF NEW PRESSURE CONTROL VALVE (PCV) INSTALLATION AT ML 504 STATION (PMIX)

  • Year: 2020
  • Owner: Petronas Gas Bhd
  • Scope: Install pressure control valve (PCV) in block valve station ML 504

EPCC OF PROJECT MANGOSTEEN - BIOMASS CONVERSION TO BIO-MONOETHYLENE GLYCOL (BIO-MEG)

  • Year: 2020
  • Owner: Petronas Research Sdn Bhd
  • Scope: Process Plant

EPCC OF KLIA PIPELINE PROJECT (KLIPP)

  • Year: 2020
  • Owner: Petronas Gas Berhad
  • Scope: Pipeline & Launcher Station.

EPCC OF HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC)

  • Year: 2019
  • Owner: Petronas Gas Berhad
  • Scope: Mechanical, Piping, Civil E&I & Structure.

EPCC OF TELOK GONG LOOP PIPELINE, MELAKA (TUAH)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Hot Tap Station, Scarapper Launcher Station, Install a new NPS 28 Gas Pipeline (Telok Gong Loop Pipeline) approx. 22km from Taboh Naning to Kuala Sungai Baru Melaka, Block Valve Station, Take Off Station and Scarapper Receiver/Metering Station.

REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) - PACKAGE A

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Fabrication, Supply and Installation of Aerial Marker & ROW Warning Signages, Supply and Install Drop Gate

UTILITIES INSTALLATION RFPC

  • Year: 2018
  • Owner: SAFRAN MESSIER BUGATTI DOWTY
  • Scope: Installation of paint booth and Supply Electrical Material

EPCC OF TEBONG CITY GATE STATION UPGRADING PROJECT, MELAKA (TURBO)

  • Year: 2018
  • Owner: Petronas Gas Berhad
  • Scope: Underground Utilities Detection, Line Tracing, Trial holes for existing utilities/pipeline and Dismantling, Packaging, Transportating & Relocating of existing facilities.

 PIPE SLEEPER AND UNDERGROUND SERVICES PACKAGE-22 AT RAPID PROJECT

  • Year:  Feb 2017
  • Owner: BINA PURI Sdn Bhd
  • Scope: Pipe Sleeper And Underground Services Package 22 At Rapid Project (Civil And Pipeline)

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: January 2016
  • Owner: PBJV Group
  • Scope: Provision of Construction of 2 Nos Hardstand, Access Road and Ancillary Works For River Crossings at Sungai Layau and Sungai Lebam For Pengerang Gas Pipeline.

HA-MBD PROJECT PHASE (II) 

  • Year: January 2016
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: Civil Detail Engineering Services For New Transformer and Switchgear Building.

HA-MBD PROJECTS (PHASE II)

  • Year: November 2015
  • Owner: Technip Geoproduction Sdn. Bhd.
  • Scope: CNC: Final Machining #2 sell Installation Works

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: September 2015
  • Owner: PBJV GROUP
  • Scope: RGT2- Pengerang Pipeline-Station Civil Work (SR500,SR501, ML502, ML504, ML505, OV511A, TOV511B, and TOV512) 

C&S WORKS – MAINLINE VALVE STATION AT PENGERANG, JOHOR

  • Year: September 2015
  • Owner: Petronas Gas Berhad
  • Scope: C&S Works at Mainline Valve Station For Procurement Construction And Commissioning  (PCC) of Pengerang Gas Pipeline (PGP) Project

INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Installation Of Mechanical Equipment With Certified ISO 9001:2008
  • Single Lifting Of Furnace : 25 Tonnes

PROCUREMENT, FABRICATION, INSTALLATION AND COMMISSIONING OF PIPELINE AND PROCESS PIPING – HA MBD PHASE 2, N.S.

  • Year: August 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia  Sdn. Bhd.
  • Scope: Procurement, Fabrication, Installation And Commissioning Of Pipeline And Process Piping With Certified ISO 9001:2008
  • Total Dia-Inch: 38,000 Dia-Inch Piping

HA-MBD PROJECTS PHASE (II)

  • Year: MAY 2015
  • Owner: Technip Geoproduction (M) Sdn. Bhd.
  • Scope: HA-MBD PHASE II (Mechanical Piping, Painting & Insulation Package)

PENGEREANG PIPELINE REGASTIFICATION PCC RGT2

  • Year: March 2015
  • Owner: PBJV Group
  • Scope: Cutting Soil, excavate for earth including hard materials and fill to designated proposed

RFPC, HA MBD PROJECT, N.S.

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.
  • Total Dia-Inch: 630 Dia-In In Piping, 10 And 20 Metric Ton Structure

TOX-2 (FLARE) PIPING MODIFICATION

  • Year: February 2015
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd
  • Scope: Procurement, Construction, Precommissioning For Civil, Structure, Piping Installation, & Mechanical Works.

NEW IA LINE PANEL TO ANDRITZ, HA- MBD PROJECT N.S

  • Year: January 2015 
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of IA Tubing & Equipment To Andritz at Preform Area

PCC (RGT 2) PENGERANG PIPELINE, JOHOR BAHRU

  • Year: November 2014
  • Owner: Petronas Gas Berhad
  • Scope: Services  Support To Cpm Construction Sdn Bhd
    o    Nde
    o    Heavy Machinery
    o    Third Party Inspector
    o    Diesel Supply
    o    Perform Wqt
    o    Inspection Site Boom
    o    Site Clearing 32 Km

ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Installation Of Steel Structures At V1 Area & Utility Area 

MODIFICATION WORKS TO ROOF REPAIR, HA – MBD PROJECT N.S

  • Year: November 2014
  • Owner: Safran- Messier Buggatti Dowty Malaysia Sdn. Bhd.
  • Scope: Piping Installation & Modification Works To Roof Repair

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Cutting/Chipping Trees Along ROW.

PENGERANG PIPELINE REGASTIFICATION, PCC RGT2

  • Year: October 2014
  • Owner: CPM Construction Sdn. Bhd.
  • Scope: Disposal Trees to Dumping Area

About Us

logoAXIANERGY (M) SDN. BHD. started its journey with its inception in Nov 2014 founded by a group of people who are highly passionate, innovative, committed and backed with years of experience involved in the construction industry.

Read More

Contact Us

AXIANERGY (M) SDN. BHD.

Tel: +606-792 2154

Fax:+606-792 2451

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Business Address:
No. 18 & 18-1, Persiaran Metro Sendayan 1, Sendayan Metropark, 71950 Bandar Sri Sendayan, Seremban, Negeri Sembilan

Site Visitor

2.png2.png2.png1.png7.png3.png
Today96
Yesterday121
This week217
This month2292
Total222173

Tuesday, 16 April 2024 18:08